Don, I intend to ask for deposits as soon as everything is finalized. I am hoping this will be by the end of March.
We will be ordering seats, guides, springs, valves ect very soon. Just need to double check valve lengths ect. Don't need 400 valves in the wrong length.
http://ford-y-block.com 20 miles east of San Diego, 20 miles north of Mexico
